landslide control
滑坡防治
常用释义
英式发音
美式发音
基本释义
- 滑坡控制;滑坡防治
例句
-
1·The main content concludes:(1) the problems existing in landslide control at the present;主要内容包括:(1) 目前滑坡防治中存在的问题;
-
2·In the design of landslide control engineering, the effect of traffic loads has not been taken into account.当前滑坡防治工程设计中,没有考虑汽车荷载对滑坡稳定性影响。
-
3·It is pointed out that underground drainage engineering should be the main measure in pebbly-clay landslide control.指出在含碎石黏性土滑坡的防治中,应将地下水排水措施作为主要防治措施。
-
4·The lattice beam and anchor pipe grouting composite structure is an effective engineering measure in landslide control.格构梁与锚管注浆复合结构是治理滑坡的一种有效措施。
-
5·As an effective measure in landslide treatment in engineering, anti-slide pile plays a significant role in world landslide control.抗滑桩作为治理滑坡的有效工程措施,在世界各国滑坡治理中占有重要的地位。
-
6·Landslide monitoring is the basis of landslide control first midst and last, and its effect need to be verified by landslide monitoring.在滑坡治理的过程中,滑坡监测始终是滑坡防治的基础,防治的效果也需要监测工作来检验。
-
7·Strengthen a research on groundwater characteristics is conductive to determination of stability and development trend of the Baota landslide and can provide basis for the landslide control.因此,加强对地下水特征的研究有助于确定宝塔滑坡的稳定性现状、发展趋势,为有针对性地提出防治对策提供依据。
-
8·Then, using the Fuzzy Theory, a comprehensive evaluation model of the post evaluation is set up for the first time, which lays a foundation for establishing the criterion of landslide control.进而采用模糊数学理论,建立了滑坡防治工程效果的模糊综合评判模型。
-
9·And combine control mining method, surface subsidence preplan theory, mining landslide area disaster forecast and numerical simulation studied out controlling mining estimate measure.并结合控制开采方法、煤柱稳定性分析、地表沉陷预计、采动滑坡区灾害预测理论以及数值模拟确定了控制开采的评价方法。
-
10·Both in 2004 and today just under 40% of people think it is in "excellent" or "good" shape: a far higher share than in 1994, when control of Congress changed hands in a Republican landslide.无论是在2004年还是今天只有不到40%的人认为经济状况“优秀”或“良好”。当1994年共和党获得压倒性胜利,国会控制权易手时,这个比例要低得多。