群发资讯网

返回主页
monte carlo analysis
蒙特卡罗分析
常用释义
基本释义
  • 蒙特卡罗分析
例句
  • 1·This paper introduced worst case analysis and monte carlo analysis with software of EWB.
    举例说明用ewb进行最坏情况分析和蒙托卡诺分析的具体方法和步骤。
  • 2·Monte Carlo analysis is used in device analysis and circuit design to evaluate the mismatch effect.
    蒙特卡罗分析被应用于器件分析和电路设计,评估器件失配对电路性能的影响。
  • 3·Accompanying this have been new approaches to data analysis using, for example, Markov Chain Monte Carlo simulations that are hugely computer intensive.
    伴随着这个,又有了使用的数据分析新方法,例如,马尔科夫链,蒙特卡洛模拟这些大型计算机密集型算法。
  • 4·Now let's discuss Sensitivity Analysis and Monte Carlo Simulation.
    现在让我们开始讨论敏感性分析和蒙特卡洛模拟。
  • 5·A software reliability testing method, judge standard and test process based on random testing model is introduced in the paper, and Monte Carlo method is used result analysis.
    本文提出一种基于随机测试模型的软件可靠性测试方法、评判准则和测试策略,并利用蒙特卡罗方法进行了分析。
  • 6·At last, some methods of uncertainty analysis are listed, such as Monte Carlo method, Taylor method, probability trees and expert judgement method.
    最后列举了不确定性分析的方法,即蒙特卡罗法、泰勒简化法、概率树法和专家判断法。
  • 7·Dynamic analysis using the Monte Carlo method in the main.
    在动力分析中主要采用蒙特卡洛方法。
  • 8·A feasibility study on Zhengzhou Matougang Sewage Treatment Works project is adopting computer programme to make Monte Carlo simulation analysis on the item financial risk.
    郑州马头岗污水处理厂工程可行性研究采用计算机程序,对项目财务风险进行蒙特卡洛模拟分析。
  • 9·Research the application of Monte Carlo method for tolerance design, display the calculate formula of estimated stack-up yield and the analysis method of sensitivity to tolerance.
    研究了蒙特卡洛法在公差优化中的应用,给出了装配成功率的计算公式以及精度灵敏性分析的方法。
  • 10·Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.
    运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。