monte carlo analysis
蒙特卡罗分析
常用释义
基本释义
- 蒙特卡罗分析
例句
-
1·This paper introduced worst case analysis and monte carlo analysis with software of EWB.举例说明用ewb进行最坏情况分析和蒙托卡诺分析的具体方法和步骤。
-
2·Monte Carlo analysis is used in device analysis and circuit design to evaluate the mismatch effect.蒙特卡罗分析被应用于器件分析和电路设计,评估器件失配对电路性能的影响。
-
3·Accompanying this have been new approaches to data analysis using, for example, Markov Chain Monte Carlo simulations that are hugely computer intensive.伴随着这个,又有了使用的数据分析新方法,例如,马尔科夫链,蒙特卡洛模拟这些大型计算机密集型算法。
-
4·Now let's discuss Sensitivity Analysis and Monte Carlo Simulation.现在让我们开始讨论敏感性分析和蒙特卡洛模拟。
-
5·A software reliability testing method, judge standard and test process based on random testing model is introduced in the paper, and Monte Carlo method is used result analysis.本文提出一种基于随机测试模型的软件可靠性测试方法、评判准则和测试策略,并利用蒙特卡罗方法进行了分析。
-
6·At last, some methods of uncertainty analysis are listed, such as Monte Carlo method, Taylor method, probability trees and expert judgement method.最后列举了不确定性分析的方法,即蒙特卡罗法、泰勒简化法、概率树法和专家判断法。
-
7·Dynamic analysis using the Monte Carlo method in the main.在动力分析中主要采用蒙特卡洛方法。
-
8·A feasibility study on Zhengzhou Matougang Sewage Treatment Works project is adopting computer programme to make Monte Carlo simulation analysis on the item financial risk.郑州马头岗污水处理厂工程可行性研究采用计算机程序,对项目财务风险进行蒙特卡洛模拟分析。
-
9·Research the application of Monte Carlo method for tolerance design, display the calculate formula of estimated stack-up yield and the analysis method of sensitivity to tolerance.研究了蒙特卡洛法在公差优化中的应用,给出了装配成功率的计算公式以及精度灵敏性分析的方法。
-
10·Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。