extension of time
延期:在规定的时间之后延长完成某项任务或工作的时间。
常用释义
英式发音
美式发音
基本释义
  • 延期:在规定的时间之后延长完成某项任务或工作的时间。
例句
  • 1·I acknowledge that we would need an extension of time.
    我承认我们需要申请延期( an extention of time)。
  • 2·We request that you grant us an extension of time.
    我们请你们把时间给我们延长-点。
  • 3·The defendant applied for an extension of time in which to serve her defense.
    被告申请延长为她辩护的时间。
  • 4·The Intended Completion Date may be revised only by the Employer by issuing an extension of time.
    计划完工日期,只能由业主签证延期进行更改。
  • 5·With the continuous extension of time smoked, mouse bone marrow erythrocytes injury was increasing continuously.
    随着烟熏时间的不断延长,小白鼠骨髓细胞的损伤程度不断加大。
  • 6·Along with the extension of time, compared with the blank group, the experimental results changed significantly.
    随细胞培养时间延长,与空白组比较作用效果也逐渐显著。
  • 7·In addition, Purchaser shall grant an extension of time to Contractor if Purchaser 's default delays performance of this Contract.
    此外,如果买方的违约行为造成延期履行本合同,则买方应向供应方提供期限的延长。
  • 8·As a kind of special claim, claims of loss efficiency usually claimed for extension of time, and seldom for financial compensation.
    工效降低索赔是一种比较特殊的索赔,工程实践中一般只要求工期延长,不要求费用补偿。
  • 9·Usage: Takes this 10 gram Tu After losing weight the loose spot to massage 15 minutes then, the extension of time massage effect is better.
    用法:取本品10克涂于减肥后松驰的部位按摩15分钟即可,延长时间按摩效果更佳。
  • 10·And the improvement of homework frequency and a continuous work the extension of time, but also to the use of the reliability put forward higher request.
    而作业频次的提高和连续作业时间的延长,也对其使用的可靠性提出了更高的要求。