excavation depth
挖掘深度
常用释义
英式发音
美式发音
基本释义
- 挖掘深度
例句
-
1·Optimization for excavation depth of foundation trench is carried out and notable economic benefit is achieved.并且对基槽开挖深度进行优化设计,取得了显著的经济效益。
-
2·By means of the existing measurement control points on the ground elevation for lofting, determine the excavation depth.利用已有的丈量控制点对原地面高程进行放样,确定开挖深度。
-
3·It was indicated that the influence of eccentricity on excavation depth increased with the increase of contact pressure.挖掘机接触压力越大,偏心距对开挖深度的影响也越大。
-
4·But with the increase of excavation depth and scale, the displacement and stability problem is becoming a focus in engineering world.随着基坑开挖深度和规模的增大,其位移和稳定问题日益成为工程界关注的焦点。
-
5·The anchor tension increases with the excavation depth, and the peak value of the tension tends to move towards the end of the anchor.随着基坑的开挖,锚杆承受的拉力越来越大且锚杆轴力峰值有向锚杆末端偏移的趋势。
-
6·Step-slope excavation is suitable for the project of which the foundation has better soil properties, lower excavation depth or enough site space for step-slope.放坡开挖适用于地基土质较好、开挖深度不深,以及施工现场有足够放坡场所的工程。
-
7·The powerful Xtrata950 hydraulic excavator and T-130 hydraulic drilling machine with the use of mining of escape, the excavation depth more than 20 meters every day.功率强大的Xtrata950液压挖掘机和T-130液压钻机配合使用挖掘逃生通道,每天的掘进深度超过20米。
-
8·It is also lighter than comparable steel or concrete structures, reducing the depth and extent of excavation and foundations.同可比较的钢材或者混凝土结构,它更加的轻巧,减少了基础开挖的的深度和广度。
-
9·If the excavation is more than 4 meters in depth, he will assign a Civil Engineer to provide a load calculation, shoring design and oversee the shoring construction during excavation.如果挖掘深度超过4米,要指派一名土建工程师进行负荷计算、支护设计并在开挖期间监督支护施工。
-
10·With more and more deep excavation, the depth is also growing.随着深基坑工程越来越多,深度也越来越大。
同义词