1·Piping erection work include: prefabrication, placing, aligning, welding and bolting.管道安装工作包括:预制加工、安置、对准、焊接和连接。
-
2·Field erection work will begin in October this year and complete on June first next year.现场安装工作将于今年十月开始至明年六月一日完工。
-
3·Scaffolding erection work by plane, by the security staff checking to ensure a solid, safe.脚手架要由架工搭设,由安全员检查,确保稳固、安全。
-
4·The Ling'ao nuclear power generator should carry out the AC and DC withstand voltage tests to check the insulation performances of the unit after finishing the erection work on site.岭澳核电发电机安装完成后,需要在现场做交、直流耐压试验,以检验发电机的绝缘特性。
-
5·Our company cover all construction activities, that is: piling, civil engineering, mechanical erection, piping, electrical, instrumentation, painting and insulation work.我们公司涉及所有施工活动,包括:打桩、土建工程、机械安装、配管、电气、仪表、油漆和保温绝缘工作。
-
6·Before work begins, an erection manual (see Secton 9.1), which if necessary takes account of the special circumstances of the site, shall be submitted.开工前,必须提交架设手册(见第9.1章节),手册必须考虑风场的特殊环境条件。
-
7·The method of a map for multi-purpose of urban basic surveying and mapping will not only im- prove work efficiency and economic benefits, but also accelerate the erection of geo-spatial framework.城市基础测绘一图多用的方法不但能够提高工作效益和经济效益,同时可加快地理空间基础框架的架设。
-
8·"Works" shall mean the Plant including the erection and other work to be carried out by the Contractor under the Contract.“工程”指合同项下承包方承担的设备安装和其它工作。
-
9·The text detailedly introduced crown block, running system, availability work period of bridge girder erection equipment and improve case for precast beams install.详细介绍了对双导梁式架桥机天车、行走系统、有效工作长度及预制梁安装就位的改进情况。
-
10·Our company cover all construction activities that is: piling civil engineering mechanical erection piping electrical instrumentation painting and insulation work.我们公司涉及所有施工活动,包括:打桩、土建工程、机械安装、配管、电气、仪表、油泼裢保温绝缘工作。