cutoff wall
[建] 隔水墙
常用释义
英式发音
美式发音
基本释义
- [建] 隔水墙;截水墙;[水利] 齿墙
例句
-
1·Then the measures of slot concrete cutoff wall were taken to the dam of Yongji reservoir.同年开始了除险加固工程,对永记水库的防渗问题采用沟槽混凝土防渗墙处理。
-
2·As a new material for cutoff wall, plastic concrete was popularly used to reinforce the dike of the Yangtze River.塑性混凝土作为一种新型的防渗墙墙体材料,在长江堤防防渗墙工程中得到了普遍的应用。
-
3·It is a must to add various additives in wall materials to meet different cutoff requirements against the cutoff wall's functions.针对防渗墙所起作用的不同,墙体材料中需添加各种外加剂以满足不同防渗标准的要求。
-
4·These new technologies and methods basically represent the advanced level in the cutoff wall construction technology in China at present.这些新技术、新方法代表了我国当前防渗墙施工技术的先进水平。
-
5·The test results show that soil concrete can satisfy the demands of cutoff wall in aspects of extensive deformation and seepage prevention.试验表明,塑性混凝土能满足防渗墙良好的变形和防渗性能的工程设计要求。
-
6·The effect on seepage is small when the opening of cutoff wall crack is less than0.3cm themaximum relative water head at the bottom of lower core wall is only2.02%.防渗墙出现裂缝开度小于0。 3cm时,对渗流场的影响不大,防渗墙下游心墙底部最大相对水头值仅为2。 02%;
-
7·For plastic concrete, due to its stronger adherence to sand and stone base and its lower elastic modulus, and its better deformation performance, it is used in cutoff wall.塑性混凝土与砂石地基结合性好,弹性模量低,用作防渗墙具有较好的变形性能。
-
8·The dam cutoff wall is one of the underground hidden projects. Due to the construction technique and quality control, the quality detection is restricted by a variety of factors.大坝截渗墙属于地下隐蔽工程,由于施工工艺及质量控制等原因,其质量检测受多种因素制约。
-
9·After accomplishment of the construction of cutoff wall, water pressure tests and quality inspection were conducted, and the results indicate that the dam meets the anti-seepage request.防渗墙施工结束后,进行压水试验和质量检查,满足主坝防渗要求。
-
10·According to the seepage problems of Longhuai dam body and its geological conditions, the plastic concrete cutoff wall seepage was adopted to obtain better effect after scheme comparison.龙怀水库坝体存在渗漏问题,根据工程地质条件通过方案比选,采用塑性砼防渗墙防渗,防渗效果较好。
同义词